Allocating tasks to Site Engineers and supervise the task completion
Ensure the Inspection and Test Plans, and Quality Check Sheets are completed as soon as the checks can be completed to ensure that the works are delivered to specification.
Participate in knowledge share events, ensures Site Engineers / Operatives are made aware of relevant information.
Understanding construction methodologies and be able to Develop / Approve relevant procedures specific to the area of works.
In association with the Section Foreman, assess the plant and resource requirements to meet the demands of site and office-based works.
Produce / Approve method statements and risk assessments and ensure they are being followed throughout the works.
Supervision of the erection, use, maintenance and dismantling of the temporary works, as applicable.
Carry out checks of the scheme during construction on site, liaising with the TWC and Site Team
Preparing and issuing Temporary Works Briefs to the relevant design departments.
Ensure Site Engineers complete setting out in accordance with design.
Ensure Design Drawings are marked up to reflect works completed as the works are finished.
Liaise with other Senior Engineers to ensure any clashes on site are managed to ensure a smooth flow of work.